Calamity

πŸ‡§πŸ‡· Brazil Risk Assessment

Max CFI Score

54

elevated

Risk Rating

D

score 71.0

Operational Status

red

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
weather54elevated
fire47elevated
air quality37moderate
flood30moderate
drought20moderate