๐จ๐ณ China Risk Assessment
Max CFI Score
58
elevatedRisk Rating
D
score 66.0
Operational Status
red
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| fire | 58 | elevated |
| air quality | 37 | moderate |
| earthquake | 27 | moderate |
| flood | 20 | moderate |
| asteroid | 17 | low |