Calamity

πŸ‡ΈπŸ‡Ύ Syria Risk Assessment

Max CFI Score

49

elevated

Risk Rating

C

score 49.0

Operational Status

orange

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
fire49elevated
flood30moderate
asteroid9low