Calamity

πŸ‡ΉπŸ‡· Turkey Risk Assessment

Max CFI Score

46

elevated

Risk Rating

C

score 48.0

Operational Status

red

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
fire46elevated
air quality37moderate
earthquake34moderate
flood30moderate