๐ฆ๐น Austria Risk Assessment
Max CFI Score
45
elevatedRisk Rating
A
score 13.0
Operational Status
orange
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| air quality | 45 | elevated |
| fire | 40 | elevated |
| weather | 20 | moderate |
| earthquake | 16 | low |