Calamity

๐Ÿ‡ช๐Ÿ‡จ Ecuador Risk Assessment

Max CFI Score

41

elevated

Risk Rating

A

score 7.0

Operational Status

green

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
fire41elevated
air quality27moderate
flood20moderate
earthquake16low