🇪🇸 Spain Risk Assessment
Max CFI Score
50
elevatedRisk Rating
B
score 39.0
Operational Status
orange
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| fire | 50 | elevated |
| weather | 42 | elevated |
| air quality | 34 | moderate |
| flood | 27 | moderate |
| earthquake | 16 | low |