๐ณ๐ฑ Netherlands Risk Assessment
Max CFI Score
43
elevatedRisk Rating
C
score 46.0
Operational Status
orange
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| river flood | 43 | elevated |
| air quality | 42 | elevated |
| fire | 41 | elevated |
| weather | 23 | moderate |
| earthquake | 16 | low |