Calamity

🇮🇩 Indonesia Risk Assessment

Max CFI Score

80

critical

Risk Rating

D

score 72.0

Operational Status

orange

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
fire80critical
flood45elevated
earthquake43elevated
air quality36moderate
volcano31moderate