Calamity

πŸ‡΅πŸ‡± Poland Risk Assessment

Max CFI Score

50

elevated

Risk Rating

B

score 21.0

Operational Status

yellow

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
fire50elevated
weather46elevated
air quality43elevated
river flood41elevated
flood30moderate
drought17low
earthquake16low