π΅π± Poland Risk Assessment
Max CFI Score
50
elevatedRisk Rating
B
score 21.0
Operational Status
yellow
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| fire | 50 | elevated |
| weather | 46 | elevated |
| air quality | 43 | elevated |
| river flood | 41 | elevated |
| flood | 30 | moderate |
| drought | 17 | low |
| earthquake | 16 | low |