πΊπΈ United States Risk Assessment
Max CFI Score
75
highRisk Rating
score 98.0
Operational Status
red
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| fire | 75 | high |
| earthquake | 46 | elevated |
| river flood | 46 | elevated |
| weather | 46 | elevated |
| flood | 45 | elevated |
| volcano | 35 | moderate |
| air quality | 31 | moderate |
| cyclone | 30 | moderate |
| tsunami | 27 | moderate |
| disease | 26 | moderate |
| drought | 13 | low |