Calamity

πŸ‡ΊπŸ‡Έ United States Risk Assessment

Max CFI Score

69

high

Risk Rating

D

score 69.0

Operational Status

red

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
fire69high
river flood43elevated
weather42elevated
volcano37moderate
flood35moderate
air quality32moderate
drought30moderate
earthquake16low
tsunami16low
disease9low