πΊπΈ United States Risk Assessment
Max CFI Score
76
highRisk Rating
D
score 70.0
Operational Status
red
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| fire | 76 | high |
| flood | 46 | elevated |
| river flood | 46 | elevated |
| weather | 46 | elevated |
| earthquake | 43 | elevated |
| disease | 40 | elevated |
| volcano | 33 | moderate |
| air quality | 31 | moderate |
| cyclone | 23 | moderate |
| drought | 20 | moderate |
| tsunami | 16 | low |