Calamity

πŸ‡ΊπŸ‡Έ United States Risk Assessment

Max CFI Score

76

high

Risk Rating

D

score 70.0

Operational Status

red

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
fire76high
flood46elevated
river flood46elevated
weather46elevated
earthquake43elevated
disease40elevated
volcano33moderate
air quality31moderate
cyclone23moderate
drought20moderate
tsunami16low