Calamity

πŸ‡ΏπŸ‡¦ South Africa Risk Assessment

Max CFI Score

51

elevated

Risk Rating

D

score 70.0

Operational Status

orange

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
weather51elevated
fire47elevated
air quality38moderate
flood27moderate