Calamity

๐Ÿ‡ฎ๐Ÿ‡ท Iran Risk Assessment

Max CFI Score

65

high

Risk Rating

A

score 4.0

Operational Status

green

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
fire65high
drought30moderate
flood20moderate
earthquake16low