🇵🇱 Poland Risk Assessment
Max CFI Score
46
elevatedRisk Rating
A
score 17.0
Operational Status
yellow
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| weather | 46 | elevated |
| river flood | 41 | elevated |
| fire | 38 | moderate |
| air quality | 34 | moderate |
| drought | 30 | moderate |