🇷🇺 Russia Risk Assessment
Max CFI Score
50
elevatedRisk Rating
B
score 34.0
Operational Status
green
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| weather | 50 | elevated |
| earthquake | 41 | elevated |
| air quality | 35 | moderate |
| flood | 35 | moderate |
| fire | 32 | moderate |
| asteroid | 9 | low |