Calamity

πŸ‡ΊπŸ‡Έ United States Risk Assessment

Max CFI Score

48

elevated

Risk Rating

D

score 69.0

Operational Status

red

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
cyclone48elevated
earthquake46elevated
fire46elevated
river flood46elevated
flood45elevated
weather42elevated
tsunami36moderate
volcano34moderate
air quality31moderate
disease24moderate
drought17low