πΊπΈ United States Risk Assessment
Max CFI Score
69
highRisk Rating
D
score 69.0
Operational Status
red
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| fire | 69 | high |
| river flood | 43 | elevated |
| weather | 42 | elevated |
| volcano | 37 | moderate |
| flood | 35 | moderate |
| air quality | 32 | moderate |
| drought | 30 | moderate |
| earthquake | 16 | low |
| tsunami | 16 | low |
| disease | 9 | low |